パート2 · レッスン16/30 · 40分
It Was Supposed to Be Ready Yesterday
Three weeks into a two-week renovation, the kitchen is still bare concrete. Say "it was supposed to be ready" and "it should have been seen before", complain politely to the builder, hear his excuses, from rotten pipes to Carnival, and get a promise, without fail. The next morning, the tiles arrive, in the wrong colour.
このレッスンにはサブスクリプションが必要です。
各レベルの最初の2レッスンは無料です。サブスクリプションひとつで、アプリでもウェブサイトでも残りのレッスンがすべて利用できます。
プランを見るすでに登録済みですか?ログインしてください。または、レッスン1を無料で聞くこともできます。
ストーリー
Thursday the fifteenth of March, in the flat in Botafogo. The kitchen has no floor, no sink and no tiles, just bare concrete, a pile of old pipes and a radio playing samba. Seu Valdir, the builder, a big man with plaster dust in his moustache, is drinking a coffee from a plastic cup. He started on the twenty-sixth of February, and said two weeks. The next morning, the tiles arrive. This is the conversation you'll be able to say by the end of the lesson.
単語カード
このレッスンの単語とフレーズを、1枚ずつカードにしました。レッスンを聞いたあとがおすすめです。
単語とフレーズ
レッスンは耳で学ぶものです。学んだことの確認に、聞き終わってから開いてください。
単語とフレーズ
レッスンは耳で学ぶものです。学んだことの確認に、聞き終わってから開いてください。
このレッスンにはあと31枚あります。登録すると、すべてのカードを見て学習できます。 プランを見る. すでに登録済みですか?ログインしてください。