PARTE 2 · AULA 16 DE 30 · 40 MINUTOS
It Was Supposed to Be Ready Yesterday
Three weeks into a two-week renovation, the kitchen is still bare concrete. Say "it was supposed to be ready" and "it should have been seen before", complain politely to the builder, hear his excuses, from rotten pipes to Carnival, and get a promise, without fail. The next morning, the tiles arrive, in the wrong colour.
Esta aula precisa de uma assinatura.
As 2 primeiras aulas de cada nível são grátis. Uma única assinatura libera todas as outras aulas, no aplicativo e no site.
Ver os planosJá é assinante? Entre. Ou ouça a aula 1 de graça.
A HISTÓRIA
Thursday the fifteenth of March, in the flat in Botafogo. The kitchen has no floor, no sink and no tiles, just bare concrete, a pile of old pipes and a radio playing samba. Seu Valdir, the builder, a big man with plaster dust in his moustache, is drinking a coffee from a plastic cup. He started on the twenty-sixth of February, and said two weeks. The next morning, the tiles arrive. This is the conversation you'll be able to say by the end of the lesson.
Flashcards
As palavras e frases desta aula, uma em cada cartão. Melhor depois de ouvir.
Palavras e frases
A aula é para os ouvidos. Abra aqui depois, para ver o que você aprendeu.
Palavras e frases
A aula é para os ouvidos. Abra aqui depois, para ver o que você aprendeu.
Mais 31 cartões nesta aula. Assine para ver e estudar todos eles. Ver os planos. Já é assinante? Entre.