PARTIE 2 · LEÇON 16 SUR 30 · 40 MINUTES
It Was Supposed to Be Ready Yesterday
Three weeks into a two-week renovation, the kitchen is still bare concrete. Say "it was supposed to be ready" and "it should have been seen before", complain politely to the builder, hear his excuses, from rotten pipes to Carnival, and get a promise, without fail. The next morning, the tiles arrive, in the wrong colour.
Cette leçon nécessite un abonnement.
Les 2 premières leçons de chaque niveau sont gratuites. Un seul abonnement débloque toutes les autres leçons, dans l’application et sur le site.
Voir les formulesDéjà abonné ? Connectez-vous. Ou écoutez gratuitement la leçon 1.
L’HISTOIRE
Thursday the fifteenth of March, in the flat in Botafogo. The kitchen has no floor, no sink and no tiles, just bare concrete, a pile of old pipes and a radio playing samba. Seu Valdir, the builder, a big man with plaster dust in his moustache, is drinking a coffee from a plastic cup. He started on the twenty-sixth of February, and said two weeks. The next morning, the tiles arrive. This is the conversation you'll be able to say by the end of the lesson.
Cartes mémo
Les mots et les phrases de cette leçon, une carte pour chacun. À faire de préférence après l’écoute.
Mots et phrases
La leçon est faite pour vos oreilles. Ouvrez ceci ensuite, pour voir ce que vous avez appris.
Mots et phrases
La leçon est faite pour vos oreilles. Ouvrez ceci ensuite, pour voir ce que vous avez appris.
31 cartes de plus dans cette leçon. Abonnez-vous pour les voir et les étudier toutes. Voir les formules. Déjà abonné ? Connectez-vous.